Part of the San Diego Unified School District, the project is located on the Hoover High School Campus in the City Heights section of San Diego, California. The Green Woodshop project is the construction of a new 5,293 sf building consisting of a classroom, open bay, and storage areas. The classroom will serve up to 30 students and 1 full time teacher at a time. The design of the building achieves enhanced energy performance, increased indoor air quality and water efficiency by utilizing a smart lighting design, low VOC (volatile organic compounds) materials, and high efficiency plumbing fixtures.
Project Info
Location: 4474 El Cajon Blvd, San Diego, CA 92115
Project Area: 5,293 sf
Project Type: K-12 Education
Version: LEED for Schools v2.0
Certification Level: Silver
Points Achieved: 38
Certification Date: 2/21/2012